TRD-2D construction status

Europe/Bucharest
Conference room Building A (DFH)

Conference room Building A

DFH

Alexandru Bercuci (IFIN-HH)
Description

Special meeting to discuss the status of Trd2d prototype construction


Meeting Access Information

Entrance window

- ~300 um global deviations and > 100 um deviations from linearity

- RA will increase the centering holes to 3000um and will try to adjust the centering holes between the PP and anode ledges such that they fit ?! 

Testing device for the pad connectivity :

- to be realized/designed by MP and VD (this week)

- short tests between pads (Vali & Lucica)

Build backplane structure

- define the mounting pins on the vacuum table

- glue the HC

- glue the copper pcb

- glue the PP which is already electrically tested