TRD-2D weekly

Europe/Bucharest
Conference room Building A (DFH)

Conference room Building A

DFH

Alexandru Bercuci (IFIN-HH)
Description

  Weekly reports on local activities done for the TRD-2D project of the CBM collaboration.

Meeting Access Information

    • 09:00 09:20
      Prototype & FASP testing 20m
      Speaker: Mariana Petris (National Institute for R&D in Physics and Nuclear Engineering (IFIN-HH), Bucharest)
    • 09:20 09:40
      Milestone tracker for TRD @ CBM 20m
      Speakers: Alexandru Bercuci (IFIN-HH), Prof. Mihai Petrovici (National Institute for Physics and Nuclear Engineering (IFIN-HH))

      CBM installation milestone end 2027

       

      • general remarks : The plan has to be done as if for managers and not physicist/engineers
      • There has to be a continuous flow of deliverables (not necessary linked to the usefulness) which are realizable (no delays admitted )
      • end of 2026 installation plans for common services
      • the situation with the TRD frame
      • Radiator construction PRR / FAT man-power collaboration

      TRD-2D specific

      • CHAMBER : FoS Start of production from other resources - matches with increasing trend of deliverables
      • CHAMBER : Correlation with the TRD frame design
      • ASIC/FEB : realistic FoS to be discussed
    • 09:40 10:00
      41th CBM Collaboration 20m
      • TRD prototype - Performances, PRR, FoS
      • mCBM data analysis
      • meeting on the TRD frame design/financing etc
    • 10:00 10:10
      TRD2D Addendum 10m
      Speaker: Alexandru Bercuci (IFIN-HH)
    • 10:10 10:30
      mCBM analysis 20m
      Speaker: Alexandru Bercuci (IFIN-HH)