  Weekly reports on local activities done for the TRD-2D project of the CBM collaboration.

Meeting Access Information

  • packed FASP end of April
  • in the mean time the test board design 
  • no other bonded FASP needed for 2023.
  • need some replacing materials for bonding machine (V. Catanescu)

TRD2D prototype construction

  • organize a hands-on  during Collaboration Meeting on wire winding installation and QA (wire tension device, etc.) procedure.
There are minutes attached to this event. Show them.
    • 09:00 09:20
      Prototype & FASP testing 20m
      Speaker: Mariana Petris (National Institute for R&D in Physics and Nuclear Engineering (IFIN-HH), Bucharest)
    • 09:20 09:40
      Milestone tracker for TRD @ CBM 20m
      Speakers: Alexandru Bercuci (IFIN-HH), Prof. Mihai Petrovici (National Institute for Physics and Nuclear Engineering (IFIN-HH))


       



       

      -------- Forwarded Message --------

      Subject:Fwd: Rebaselining 2023, TRD
      Date:Sat, 18 Feb 2023 11:07:45 +0100
      From:Philipp Kaehler <p.kaehler@uni-muenster.de>
      To:Alexandru Bercuci <abercuci@niham.nipne.ro>
      CC:Piotr Gasik <P.Gasik@gsi.de>



      Hi Alex,

      i am forwarding questions from Piotr on our reported new dates.


       

      Inner modules: do you really think we will have an EDR in April?
       


      Proposal is to combine internal review and EDR, and this is the suggested date. Alex, should we relax that "latest" date of the milestone by 3 month? Aiming for April, but relaxing the deadline?

       

      Inner modules IKC: how to understand “CDR” and “PRR”? Is it after FOS
      of inner chambers is accepted? If I remember correctly after all
      details of the production are fixed, the IKC will be signed, right? I
      would then connect it with the FOS of inner chambers.
       


      All the in-kind applications can be prepared after the TDR-addendum was accepted. CDR = its hand in. Having reached all the signatures and having it valid, is PRR. Alex, please correct, if neccessary.

       

      Inner modules IKC: before I include FASPs - if I understand correctly
      in order to start with trd2d electronics we need this IKC signed,
      right? Do we have realistic time for the IKC signing? Again, it
      relates to the previous questions what is “CDR” and “PRR"
       





      Best