Please upload your talks before meeting starts

TRD-2D weekly

Europe/Bucharest
Conference room Building A (DFH)

Conference room Building A

DFH

Alexandru Bercuci (IFIN-HH)
Description

  Weekly reports on local activities done for the TRD-2D project of the CBM collaboration.

Meeting Access Information

    • 09:00 09:05
      Intro 5m
      • NAF readiness for CBM (/ ALICE) related analysis
      Speakers: Alexandru Bercuci (IFIN-HH), Andrei Herghelegiu (National Institute of Physics and Nuclear Engineering (IFIN-HH)), Claudiu Schiaua (IFIN-HH/DFH), Gheorghe Caragheorgheopol (National Institute of Physics and Nuclear Engineering (IFIN-HH)), Laura Radulescu (IFIN-HH), Mariana Petris (National Institute for R&D in Physics and Nuclear Engineering (IFIN-HH), Bucharest), Prof. Mihai Petrovici (National Institute for Physics and Nuclear Engineering (IFIN-HH)), Vasile Catanescu (National Institute of Physics and Nuclear Engineering (IFIN-HH))
      • workers will be installed THIS WEEK !!!! [done]
      • all info are accessible at  https://indico.nipne.ro/event/265/
    • 09:05 09:25
      PRR preparation 20m
      Speaker: Laura Radulescu (IFIN-HH)
      • lista modificarilor facute la proiect in urma testelor in casa (Laura this WEEK !)
        • Ecran - se trimite pentru oferta/productie (azi Bugi/Laura)
        • HC capac va fi perforat odata cu barele
        • Pad-Plane in productie. Vezi oferta de pret (Bugi/Laura)
        • Prelucrare FR4 (minimizare oferta de pret)
          • Clinceni -> Trimis proiect azi (Laura)
          • Pro Plastic Engineering (Meeting 6.07/Laura)
          • ELOP -> Trimis proiect azi (Laura)
        • Ref. aprovizionare placa de C si kapton aluminizat (e-mail firma Austria) (MP + Laura / Azi)
      • HV box : determinat spatiul ocupat de conectori (done) si de construit o macheta (Radu Andrei/Cara)
      • testat masina de masurat fire pe o bobinare de proba (This WEEK Andrei/Cristi)
      • testat masina de masurat fire pe o rama care sa simuleze detectorul (60cm)
      • FASP 90pcs vor ajunge pentru testare (Claudiu 1-2 WEEKs) pe o 
      • Testare cartela pasiva, minimala (Claudiu/George/Vali 2-3 WEEKs) - se cauta oferta pentru slot gripper !
      • Cartela test (mass production) - diferita de cartela FEB prin faptul ca socket-ul (GRIPPER) pentru FASP este reutilizabil.  
      • S-au livrat ADC-urile 32 channels (pentru 2 camere + rezerve) 200 buc, FPGA urmeaza.
    • 09:25 09:45
      TRD frame 20m
      • latest contributions on the topic
      • meeting reminder
      Speaker: Alexandru Bercuci (IFIN-HH)