Description

  Weekly reports on local activities done for the TRD-2D project of the CBM collaboration.

Meeting Access Information

    • 1
      Intro
      Speakers: Alexandru Bercuci (IFIN-HH), Andrei Herghelegiu (National Institute of Physics and Nuclear Engineering (IFIN-HH)), Claudiu Schiaua (IFIN-HH/DFH), Gheorghe Caragheorgheopol (National Institute of Physics and Nuclear Engineering (IFIN-HH)), Laura Radulescu (IFIN-HH), Mariana Petris (National Institute for R&D in Physics and Nuclear Engineering (IFIN-HH), Bucharest), Prof. Mihai Petrovici (National Institute for Physics and Nuclear Engineering (IFIN-HH)), Vasile Catanescu (National Institute of Physics and Nuclear Engineering (IFIN-HH))
    • 2
      PRR preparation
      Speakers: Andrei Herghelegiu (National Institute of Physics and Nuclear Engineering (IFIN-HH)), Claudiu Schiaua (IFIN-HH/DFH), Laura Radulescu (IFIN-HH)
      • lista modificarilor facute la proiect in urma testelor in casa (Laura this WEEK !)
        • Ecran - se trimite pentru oferta/productie (azi Bugi/Laura)
          • Va rugam sa ne executati conform ofertei, produsul
            Circuit imprimat ECRAN-TRD-2020-V4
            600 x 600 mm  ???????, FR4 0,12 mm 35/0, fara
            finisarea suprafetei
            2 bucati, pret unitar 836,1 RON/buc
            Acest e mail reprezinta COMANDA Ferma !
        • Delivery Ecran 25.07.
        • Pad-Plane in productie + lipire manuala flat-cables (delivery 25.07).
        • Prelucrare FR4 (minimizare oferta de pret)
          • Clinceni -> (Laura) -> in asteptare
          • Pro Plastic Engineering  (Laura) -> in asteptare
          • ELOP -> (Laura)
          • HC-capac va fi executat la aceasi firma care face si restul componentelor
        • Ref. aprovizionare placa de C si kapton aluminizat (e-mail firma Austria) (MP + Laura / Azi)
          • Asteptam mostra (trimisa 13.07 ... Laura)
          • kapton Al ? (de identificat o sursa)
      • HV box : de construit o macheta (Radu Andrei/Cara) [in progress 25.07]
        • cerere de oferta pentru conectorii LEMO 05 (Vali)
      • testat masina de bobinare de proba (Andrei) [done]
        • De facut revizie (RA 25.07) 
      • testat masina de masurat (Andrei)
        • sistemul LabView curent nu mai este functional
        • se va achizitiona sistemul LabView (cartela [1K Euro], licenta LabView [2K Euro], soft specific Daniel Bonaventura, PC Windows Licenta) folosit la Munster/FRA ! 
      • FASP 90pcs vor ajunge pentru testare (Claudiu 25.07)
        • - asteptam FASP-urile bondate pentru a lua o decizie vis-a-vis de instalarea pe FEB !
      • Testare cartela pasiva, minimala (Claudiu/George/Vali 2-3 WEEKs) 
        • design ready 350Euro / 5 pcs (delivery days)
        • socket Elastomer (450Euro/pc x 3) SCA BGA 6213.
      • Cartela test (mass production) - in lucru de discutat detalii.  
      • Livrare FPGA [in progress].