Please upload your talks before meeting starts

TRD-2D weekly

Europe/Bucharest
Conference room Building A (DFH)

Conference room Building A

DFH

Alexandru Bercuci (IFIN-HH)
Description

  Weekly reports on local activities done for the TRD-2D project of the CBM collaboration.

Meeting Access Information

    • 09:00 09:05
      Intro 5m
      Speakers: Alexandru Bercuci (IFIN-HH), Andrei Herghelegiu (National Institute of Physics and Nuclear Engineering (IFIN-HH)), Claudiu Schiaua (IFIN-HH/DFH), Gheorghe Caragheorgheopol (National Institute of Physics and Nuclear Engineering (IFIN-HH)), Laura Radulescu (IFIN-HH), Mariana Petris (National Institute for R&D in Physics and Nuclear Engineering (IFIN-HH), Bucharest), Prof. Mihai Petrovici (National Institute for Physics and Nuclear Engineering (IFIN-HH)), Vasile Catanescu (National Institute of Physics and Nuclear Engineering (IFIN-HH))
    • 09:05 09:35
      PRR preparation 30m
      Speakers: Andrei Herghelegiu (National Institute of Physics and Nuclear Engineering (IFIN-HH)), Claudiu Schiaua (IFIN-HH/DFH), Laura Radulescu (IFIN-HH)
      • lista modificarilor facute la proiect in urma testelor in casa si a cererilor de oferta pentru componente
        • lista de preturi actualizata pentru constructia unui module TRD2D -> Addendum (Laura)
        • cerere oferta (ELI, Optoelectronica, Pitesti) (Laura)
        • In vederea comenzilor pentru prototip RO-FAIR .... 
      • HV box : 
        • Prezentare status dedicat 19.09 (Cara)
      • Masina de bobinare
        • Utilizabila (Andrei / Andrei [done])
      • masina de masurat pitch/tensiune (Andrei)
        • Se va schimba HDD 19.09 (Claudiu/Andrei )
      • FASP 88 pcs au ajuns
        • Testat 7 buc (1 defecta mecanic, 1 defect, 1 calitate II [prag mare], 4 buc folosibile)
        • 12.09 (Claudiu) comanda ferma catre firma de bonding
        • Testat restul (Cara / George/ Claudiu)
      • cartela pasiva testare, minimala (Claudiu) [done
      • Cartela test (mass production) - design "complet" [in progress]
        • varianta 1 - FEB cu decupari pentru flat-uri - 16 straturi (700+1000+1000 = 3K)
        • de facut simulari de material budget pentru varianta aleasa (Alex)  
    • 09:35 10:00
      TRD2D @ mCBM 25m
      • Bug / feature of Chamber to FEB connection
      • Performance after fix
      Speaker: Alexandru Bercuci (IFIN-HH)