Description

  Weekly reports on local activities done for the TRD-2D project of the CBM collaboration.

Meeting Access Information

    • 09:00 09:05
      Intro 5m
      Speakers: Alexandru Bercuci (IFIN-HH), Andrei Herghelegiu (National Institute of Physics and Nuclear Engineering (IFIN-HH)), Claudiu Schiaua (IFIN-HH/DFH), Gheorghe Caragheorgheopol (National Institute of Physics and Nuclear Engineering (IFIN-HH)), Laura Radulescu (IFIN-HH), Mariana Petris (National Institute for R&D in Physics and Nuclear Engineering (IFIN-HH), Bucharest), Prof. Mihai Petrovici (National Institute for Physics and Nuclear Engineering (IFIN-HH)), Vasile Catanescu (National Institute of Physics and Nuclear Engineering (IFIN-HH))
    • 09:05 09:25
      mCBM preparation 20m
      Speakers: Alexandru Bercuci (IFIN-HH), Claudiu Schiaua (IFIN-HH/DFH)

      FEB

      • de comandat componente 
        • PCB 20 buc (1 / 2 module TRD2D) (5k)
        • componente 20 (PCB) (10k)
        • asamblare 20 (PCB) (10k)
        • primele cartele in DFH in 15.01.24 - in urma testelor se asmbleaza si restul pana la 20 (15.01.24)
          • Aprobata varianta Megtron6
          • testare FASP [George] - toata productia (20 * 12 + 10 = 240 + 60 / 500 buc) trebuie trimisa la montare [8.12.23]
      • participare la mCBM
        • -> 15.01.24 - cartelele ajung in DFH
        • -> 25.01.24 - cartelele testate in DFH
        • -> 28.01.24 - instalare pe TRD-2D si instalare in mCBM
        • -> 01.02.24 - teste locale, debug, contingency

      Mecanica

      • suporti cartele cu inaltime variabile (RAndrei)
      • tresa de masa

      LV

      • 2 linii folosite pentruTRD2D [done]
      • 3 6 linii folosite pentru TRD1D (50W) [done
      • de testat dependenta puterii de counting rate (pulser)

      HV

      • 3 canale HV ISEG (Philipp) [done]
      • 3 cabluri HV 5m (SHV) (Cara 12.12.23)
      • 3 cabluri HV 10m 10m (SHV)(Cara 12.12.23)
      • de verificat filtrele de HV

      DAQ

      • CROB - inca 3 buc (Joerg / Claudiu)
      • CRI - 1 buc (David / Claudiu)
      • optical fibers pentru 6 CROB/module (David / Alex) 
    • 09:25 09:55
      Ongoing activities 30m
      • Placa de montaj pentru construirea detectorului (RAndrei / Laura)
      • lista de preturi actualizata pentru constructia unui module TRD2D -> Addendum (Laura)
        • oferta 1 : ProPlastic Bucuresti [done]
          • livrare 31.01.24 [Laura]
        • oferta 2 : AFT Clinceni
        • oferta 3 : IPAD (partiala)
      • Fibra de C - procurare
        • oferte 1: FACC (Paminger / Laura) [on hold]
        • oferta 2 : AFT Clinceni (Laura / George) [running]
          • Mylar+Al -> Kapton+Al 150EUR/pc x 44; 450/pc x 2 (R.Andrei/Laura) [done
            • s-a dat comanda, trebuie pus la dispozitie KA folie. (Laura / Andrei R)
          • Discutat strategia pentru productie !
        • oferta 3 : GSI (Patrick Dahm / Laura) [in progress]
      • Fire Anodice
        • mass production issue (P. Kaehler / Mariana)
        • de realizat stocul local (Andrei H) inventar/..  [done]
          • de stocat bobinele noi in dulapul curat, bobinele incepute folosite pentru prototipurile PPR
        • procedura QA (Andrei N/Alex) https://indico.nipne.ro/event/287/ [in progress]
        • RAMA DE BOBINAT (R Andrei / Andrei H / Andrei N / Laura /) - 10.02 executie !
      • HV box : 
        • PCB (Cara/Bugi/Claudiu) achizitie de piese [running]
        • PCB design [done]
          • s-a identificat o posibila strapungere electrica la condensatori - solutie cu Silicon, Araldit, etc
        • Proiect mecanic (Andrei R.) [in progress]
      • masina de masurat pitch/tensiune (Andrei)
        • teste (Andrei) [in progress]
      • Cartela FEB (mass production) - design "complet" [in progress]
        • FEB cu decupari pentru flat-uri - 18 straturi (700+1000+1000 = 3K)
      • Cartela de Chain (design done)
      • Cartela DAQ (QSFP+) done
      • Cartela (Vttx / optics CERN) - CROB-dedicat TRD2D [done
      • Cartela (Vtrx / optics CERN) - de inlocuit CROB pentru TRD2D [done
      • Cartela DCS (senzoti temperatura, ADC, interfata DCS, interfata TFC, programare JTAG, pulser) 
        • (may use lpGBTx / GBTx) 
      • simulari pentru noua geometrie (mecanica + FEE) 
        • material budget pentru varianta aleasa (Alex) [in progress]