    • 1
      Status of the order for signal, HV and connector PCBs for M0
      • the most part of the PCBs arrived.

      • still pending:

      23DS96-A-PF - 7 buc
      23DS96-KD-PF - 7 buc
      23DS196-A-PF - 13 buc

      Speakers: Daniel Bartos, George Stoian

      Oferta executie circuite imprimate 21.11.2023 

      Contact photo

       
      Buna ziua,
      Va rugam sa actualizati oferta de pret din date de 20.07.2023 , va retrimitem fisierele GERBER pentru circuite


      Cu stima,
      -- 
      Daniel Bartos
      George Stoian
       
      -------- Original Message --------
      Subject: Livrare circuite
      Date: 2023-12-12 23:36
      From: Stefania Costovici <pcbdept@gmail.com>
      To: bartos@nipne.ro
      Cc: bugibartos@yahoo.com

      Buna ziua,
      Maine va aduc 21 din 24 tipuri de circuite comandate.
      Rest de livrat:

      23DS96-A-PF - 7 buc
      23DS96-KD-PF - 7 buc
      23DS196-A-PF - 13 buc

      Cu stima,
      Stefania Costovici
      SC INGENIUM DEVELOPMENT SRL
       
    • 2
      Status of the twisted pair signal cable for implementation in M0
      Speakers: George Stoian, Gheorghe Caragheorgheopol, Valerica Aprodu
    • 3
      Status of the implementation of the the gas distributors on the back panel of M0
      Speakers: Andrei Radu, Laura Radulescu (IFIN-HH)

      Distribuitoare in modulul M0

      • se vor realiza desenele de executie pentru noile variante de distribuitoare (mici modificari fata de varianta printata deja) - Radu Andrei
      • se va realiza modelul 3D si se vor da la printat - Laura Radulescu

      Distribuitoare pentru detectorii RPC de 60 (6buc)

      • date deja la printat
      • deocamdata probleme cu imprimanta - se investigheaza 

       

       

      Today Andrei said that everything is solved only the machine working to be done

       

       

       

    • 4
      M0 housing box manufacture.
      Speakers: George Stoian, Valerica Aprodu, Viorel Duta
    • 5
      Design of the CBM-TOF inner zone based on the direct flow MSMGRPCs;
      Speakers: Laura Radulescu (IFIN-HH), Viorel Duta
    • 6
      back up of the all files belonging to the design of the CBM-TOF inner zone.

      All people involved have to create a folder on her/his computer where to save the files already approved to be sent for manufacture. A back up of these folders will be made on an external hard disk.

      Speaker: Mariana Petris (National Institute for R&D in Physics and Nuclear Engineering (IFIN-HH), Bucharest)
    • 7
      Status of the in-kind contract draft
      Speakers: Mariana Petris (National Institute for R&D in Physics and Nuclear Engineering (IFIN-HH), Bucharest), Prof. Mihai Petrovici (National Institute for Physics and Nuclear Engineering (IFIN-HH))