Please upload your talks before meeting starts

TRD-2D weekly

Europe/Bucharest
Conference room Building A (DFH)

Conference room Building A

DFH

Alexandru Bercuci (IFIN-HH)
Description

  Weekly reports on local activities done for the TRD-2D project of the CBM collaboration.

Meeting Access Information

    • 09:00 09:05
      Intro 5m
      Speakers: Alexandru Bercuci (IFIN-HH), Andrei Herghelegiu (National Institute of Physics and Nuclear Engineering (IFIN-HH)), Claudiu Schiaua (IFIN-HH/DFH), Gheorghe Caragheorgheopol (National Institute of Physics and Nuclear Engineering (IFIN-HH)), Laura Radulescu (IFIN-HH), Mariana Petris (National Institute for R&D in Physics and Nuclear Engineering (IFIN-HH), Bucharest), Prof. Mihai Petrovici (National Institute for Physics and Nuclear Engineering (IFIN-HH)), Vasile Catanescu (National Institute of Physics and Nuclear Engineering (IFIN-HH))
    • 09:05 09:25
      Scanning @ Frame device (postponed) 20m
      • Update on the wires installation devices
      Speakers: Andrei Naziru (ELI-NP), Andrei Radu (IFIN-HH), Laura Radulescu (IFIN-HH)

      - 23.01 - prezentare in meeting-ul TRD2D se amana. Voi face eu un bilant al realizarilor de pana acum

      - 26.01 - intalnire DFH pentru

      •      compatibilitate intre profile Bosch si Item
      •     masuratori gabaritice ale instalatiei existente (relatie pe inaltime intre device de masurare tensiune si device aliniere)
      •    asezare in spatiul camerei de montaj, ergonomia tehnologiei de asamblare

      - 30.01 - prezentare proiect final in DFH pt grupul TRD2D 

      - 29.01 - 2.02 - teste locale ELI CNC

      - 5.02 - 9.02 - montaj in DFH, scanner pentru aliniere, rama, device tensiune

      - 12.02 - 16.02 - teste de imagistica pe o bobinare de proba

    • 09:25 09:45
      mCBM preparation 20m

      -status of FEB production / test

      Speakers: Claudiu Schiaua (IFIN-HH/DFH), Alexandru Bercuci (IFIN-HH)

      Tactica

      • -> 15.01 - primele 3 cartelele de test ajung in DFH
        • ??? - in functie de rezultatul testului David & Christian & TRD1D primesc OK-ul pentru scoaterea TRD2D din cave si depozitare
        • ??? - upgrade infrastructura cave (HV, Optic fibers)  (DE, CS & PK, FR) 
      • -> ??.02 - toate cartelele testate in DFH si gata pentru transport
      • -> 21.02 -> 28.02 - montare FEB si instalare TRD2D in mCBM
        • 22.02 - 24.02 - SIS 12C -> 18O. Cave inchis dar pot exista ferestre ! Asemenea pentru 28.02, SIS 18O -> 197Au. 
      • -> 28.02 - teste locale, debug
      • -> 29.02 - primul fascicol de Au pt mCBM, teste (locale)
      • -> 4.03 - 8.03 - CM
      • -> 18.03 - al doilea fascicol de Au pt mCBM (probabil)

      Mecanica

      • suporti cartele cu inaltime variabile (RAndrei)
        • suporti capete imprimate la 3D printer (RAndrei / Laura)
      • tresa de masa

      LV [done]

      • de testat dependenta puterii de counting rate (pulser)

      HV

      • 3 canale HV ISEG (Philipp) [done]
      • 3 cabluri HV 5m (SHV) (done)
      • 3 cabluri HV 10m 10m (SHV)(done)
      • de verificat filtrele de HV

      DAQ

      • CROB - inca 3 buc (Joerg / Claudiu)
      • optical fibers pentru 6 CROB/module + mapping (David / Claudiu) (done)
    • 09:45 10:05
      HV box design 20m
      • space, installation, accessibility requirements
      • design guidelines
      Speakers: Claudiu Schiaua (IFIN-HH/DFH), Gheorghe Caragheorgheopol (National Institute of Physics and Nuclear Engineering (IFIN-HH))
    • 10:05 10:35
      Production readiness prototype status 30m
      • Placa de montaj pentru construirea detectorului (RAndrei / Laura)
        • ProPlastic Bucuresti [in progress] 25.01 catre procesator
      • lista de preturi actualizata pentru constructia unui module TRD2D -> Addendum (Laura)
        • oferta 1 : ProPlastic Bucuresti [done]
          • livrare 31.01.24 [Laura]
        • oferta 2 : AFT Clinceni
        • oferta 3 : IPAD (partiala)
      • Fibra de C - procurare
        • oferta 2 : AFT Clinceni (Laura / George) [running]
          • Mylar+Al -> Kapton+Al 150EUR/pc x 44; 450/pc x 2 (R.Andrei/Laura) [done
            • s-a dat comanda, trebuie pus la dispozitie KA folie. (Laura / Andrei R)
          • Discutat strategia pentru productie !
      • Fire Anodice
        • mass production issue (P. Kaehler / Mariana)
        • de realizat stocul local (Andrei H) inventar/..  [done]
          • de stocat bobinele noi in dulapul curat, bobinele incepute folosite pentru prototipurile PPR
        • procedura QA aliniere anod vs catod (Andrei N/Alex) https://indico.nipne.ro/event/287/ [in progress]
        • RAMA DE BOBINAT (R Andrei / Andrei H / Andrei N / Laura /) - 10.02 executie !
      • HV box : 
        • PCB (Cara/Bugi/Claudiu) achizitie de piese [running]
        • PCB design [done]
          • s-a identificat o posibila strapungere electrica la condensatori - solutie cu Silicon, Araldit, etc
        • Proiect mecanic (Andrei R.) [in progress]
      • masina de masurat pitch/tensiune (Andrei)
        • prezentare pt 16.01 (Andrei) [in progress]
      • Cartela FEB (mass production) - design "complet" [in progress]
        • FEB cu decupari pentru flat-uri - 18 straturi (700+1000+1000 = 3K)
      • Cartela de Chain (design done)
      • Cartela DAQ (QSFP+) done
      • Cartela (Vttx / optics CERN) - CROB-dedicat TRD2D [done
      • Cartela (Vtrx / optics CERN) - de inlocuit CROB pentru TRD2D [done
      • Cartela DCS (senzoti temperatura, ADC, interfata DCS, interfata TFC, programare JTAG, pulser) 
        • (may use lpGBTx / GBTx) 
      • simulari pentru noua geometrie (mecanica + FEE) 
        • material budget pentru varianta aleasa (Alex) [in progress]  
    • 10:35 10:55
      GSI PR23 - call for contributions 20m
      • Ana-mCBM (Alex)
      • Det-trd2d (Alex)
      • Soft-2dGeo (Alex)
      • [ FASP bonding (Alex) ]
      • [ FEB design (Alex) ]
      • TRD2D first prototype (Mariana) ???