RPC weekly meeting
→
Europe/Bucharest
Conference Room
Conference Room
Mariana Petris
(National Institute for R&D in Physics and Nuclear Engineering (IFIN-HH), Bucharest)
Contact
-
-
1
Status of the connector PCBs implementation on M0 back panel
- connector soldering
- gluing the PCBs on the back panel
Speakers: Daniel Bartos, George Stoian, Valerica Aprodu, Viorel DutaOferta executie circuite imprimate 21.11.2023
From bartos To Stefania Costovici, Mariana Petris, Mihai Petrovici Date Today 11:42 Buna ziua,
Va rugam sa actualizati oferta de pret din date de 20.07.2023 , va retrimitem fisierele GERBER pentru circuite
Cu stima,
--
Daniel Bartos
George Stoian-------- Original Message --------
Subject: Livrare circuite
Date: 2023-12-12 23:36
From: Stefania Costovici <pcbdept@gmail.com>
To: bartos@nipne.ro
Cc: bugibartos@yahoo.com
Buna ziua,
Maine va aduc 21 din 24 tipuri de circuite comandate.
Rest de livrat:
23DS96-A-PF - 7 buc
23DS96-KD-PF - 7 buc
23DS196-A-PF - 13 buc
Cu stima,
Stefania Costovici
SC INGENIUM DEVELOPMENT SRL
-
2
Status of the twisted pair signal cable for implementation in M0
- cutter procurement
Speakers: George Stoian, Gheorghe Caragheorgheopol, Valerica Aprodu -
3
Manufacture of the gas distributors for chambers and back panelSpeaker: Laura Radulescu (IFIN-HH)
-
4
Status of the implementation of the the gas distributors on the back panel of M0Speakers: Andrei Radu, Laura Radulescu (IFIN-HH)
Distribuitoare in modulul M0
- se vor realiza desenele de executie pentru noile variante de distribuitoare (mici modificari fata de varianta printata deja) - Radu Andrei
- se va realiza modelul 3D si se vor da la printat - Laura Radulescu
Distribuitoare pentru detectorii RPC de 60 (6buc)
- date deja la printat
- deocamdata probleme cu imprimanta - se investigheaza
-
5
M0 back panel equipment
- connectors
- gas distributors
- gas connectors
- HV connectors
- sealing gasket
Speakers: Andrei Radu, George Stoian, Valerica Aprodu, Viorel Duta -
6
Design of the CBM-TOF inner zone based on the direct flow MSMGRPCsSpeakers: Laura Radulescu (IFIN-HH), Viorel Duta
-
7
INVENTOR compatibility check and procurementSpeakers: Laura Radulescu (IFIN-HH), Viorel Duta
-
8
backup of the all files belonging to the design of the CBM-TOF inner zone
All people involved have to create a folder on her/his computer where to save the files already approved to be sent for manufacture. A back up of these folders will be made on an external hard disk.
Speaker: Mariana Petris (National Institute for R&D in Physics and Nuclear Engineering (IFIN-HH), Bucharest) -
9
Assembling manualSpeaker: Mariana Petris (National Institute for R&D in Physics and Nuclear Engineering (IFIN-HH), Bucharest)
-
10
Status of the in-kind contract draftSpeakers: Mariana Petris (National Institute for R&D in Physics and Nuclear Engineering (IFIN-HH), Bucharest), Prof. Mihai Petrovici (National Institute for Physics and Nuclear Engineering (IFIN-HH))
-
1