Please upload your talks before meeting starts

TRD-2D weekly

Europe/Bucharest
Conference room Building A (DFH)

Conference room Building A

DFH

Alexandru Bercuci (IFIN-HH)
Description

  Weekly reports on local activities done for the TRD-2D project of the CBM collaboration.

Meeting Access Information

    • 1
      Intro
      Speakers: Alexandru Bercuci (IFIN-HH), Andrei Herghelegiu (National Institute of Physics and Nuclear Engineering (IFIN-HH)), Claudiu Schiaua (IFIN-HH/DFH), Gheorghe Caragheorgheopol (National Institute of Physics and Nuclear Engineering (IFIN-HH)), Laura Radulescu (IFIN-HH), Mariana Petris (National Institute for R&D in Physics and Nuclear Engineering (IFIN-HH), Bucharest), Prof. Mihai Petrovici (National Institute for Physics and Nuclear Engineering (IFIN-HH)), Vasile Catanescu (National Institute of Physics and Nuclear Engineering (IFIN-HH))
    • 2
      mCBM preparation

      -status of FEB production / test

      Speakers: Claudiu Schiaua (IFIN-HH/DFH), Alexandru Bercuci (IFIN-HH)

      Tactica

      • -> 15.01 - primele 3 cartelele de test ajung in DFH
        • ??? - in functie de rezultatul testului David & Christian & TRD1D primesc OK-ul pentru scoaterea TRD2D din cave si depozitare
        • ??? - upgrade infrastructura cave (HV, Optic fibers)  (DE, CS & PK, FR) 
      • -> ??.02 - toate cartelele testate in DFH si gata pentru transport
      • -> 21.02 -> 28.02 - montare FEB si instalare TRD2D in mCBM
        • 22.02 - 24.02 - SIS 12C -> 18O. Cave inchis dar pot exista ferestre ! Asemenea pentru 28.02, SIS 18O -> 197Au. 
      • -> 28.02 - teste locale, debug
      • -> 29.02 - primul fascicol de Au pt mCBM, teste (locale)
      • -> 4.03 - 8.03 - CM
      • -> 18.03 - al doilea fascicol de Au pt mCBM (probabil)

      Mecanica

      • suporti cartele cu inaltime variabile (RAndrei)
      • tresa de masa

      LV [done]

      • de testat dependenta puterii de counting rate (pulser)

      HV

      • 3 canale HV ISEG (Philipp) [done]
      • 3 cabluri HV 5m (SHV) (done)
      • 3 cabluri HV 10m 10m (SHV)(done)
      • de verificat filtrele de HV

      DAQ

      • CROB - inca 3 buc (Joerg / Claudiu)
      • optical fibers pentru 6 CROB/module + mapping (David / Claudiu) (done)
        • CROB13 fara conexiune la prima testare - De schimbat CROB [in progress]
    • 3
      HV discussion
      Speakers: Claudiu Schiaua (IFIN-HH/DFH), Alexandru Bercuci (IFIN-HH)

      Hi Alex, 

      our planning is based so far on ISEG EHS 305 20p as listed here 
      https://iseg-hv.com/de/products/detail/EHS 

      i.e. 48 channels positive per module, up to 2 kV (!), up to 1.5 mA per channel, common floating ground. 

      An offer is attached, the abovementioned modules can be seen in position 8. Additionally, for the drift wires, position 9 for negative voltage up to (!) -500 V. 

      Planning is: one channel (of each polarity) per chamber. Which was suiting the anode current calculations, but should still be confirmed with mCBM reality. 

      Up to 10 of those modules can be operated in the crate as in position 1, each equipped with a "CC24" controller as in position 2. 

      Prices of the single positions in the offer are without tax. 

      --> Unfortunate situation is, that BMBF is granting so far only money for HV supply of the "german" chambers. I do only report that situation, but can neither defend nor directly influence it. We shall check in detail later, if anything can be covered still. 

      To my understanding, all TRD HV has to be based on same technology. The suggested crates and "CC24" controllers do offer native EPICS. 

      Best regards 
      Philipp 
       

    • 4
      Production readiness prototype status
      • Placa de montaj pentru construirea detectorului (RAndrei / Laura) (9.02)
      • lista de preturi actualizata pentru constructia unui module TRD2D -> Addendum (Laura)
        • oferta 1 : ProPlastic Bucuresti [done]
          • livrare 9.02.24 [Laura] [in progress]
      • Fire Anodice 
        • aliniere anod vs catod (Andrei N/Alex) https://indico.nipne.ro/event/287/ [in progress]
        • RAMA DE BOBINAT (R Andrei / Andrei H / Andrei N / Laura /) - 10.02[in progress]
        • calibrare masurat pitch/tensiune (Andrei H) [in progress]
      • HV box : 
        • PCB (Cara/Bugi/Claudiu) achizitie de piese [running]
        • PCB design [done]
          • s-a identificat o posibila strapungere electrica la condensatori - solutie cu Silicon, Araldit, etc
        • Proiect mecanic (Andrei R.) [in progress]
      • Cartela FEB (mass production) - testare [in progress]
      • Cartela DCS (senzoti temperatura, ADC, interfata DCS, interfata TFC, programare JTAG, pulser) 
        • (may use lpGBTx / GBTx) 
      • simulari pentru noua geometrie (mecanica + FEE) 
        • material budget pentru varianta aleasa (Alex) [in progress]  
    • 5
      FASP bonding [on hold]
      • final conclusions
      • strategy
        TBD dupa finalizarea testelor la mCBM24
      Speakers: Claudiu Schiaua (IFIN-HH/DFH), Alexandru Bercuci (IFIN-HH)

      de discutat dupa campania de la mCBM