  Weekly reports on local activities done for the TRD-2D project of the CBM collaboration.

Meeting Access Information

    • 1
      Intro
      Speakers: Alexandru Bercuci (IFIN-HH), Andrei Herghelegiu (National Institute of Physics and Nuclear Engineering (IFIN-HH)), Claudiu Schiaua (IFIN-HH/DFH), Gheorghe Caragheorgheopol (National Institute of Physics and Nuclear Engineering (IFIN-HH)), Laura Radulescu (IFIN-HH), Mariana Petris (National Institute for R&D in Physics and Nuclear Engineering (IFIN-HH), Bucharest), Prof. Mihai Petrovici (National Institute for Physics and Nuclear Engineering (IFIN-HH)), Vasile Catanescu (National Institute of Physics and Nuclear Engineering (IFIN-HH))
    • 2
      Impressions from 43th CM
      Speakers: Laura Radulescu (IFIN-HH), Mariana Petris (National Institute for R&D in Physics and Nuclear Engineering (IFIN-HH), Bucharest), Alexandru Bercuci (IFIN-HH)
    • 3
      mCBM preparation

      -status of FEB production / test

      Speakers: Claudiu Schiaua (IFIN-HH/DFH), Alexandru Bercuci (IFIN-HH)

      Tactica

      • -> 19.02 - primele 3 cartelele de test ajung in DFH
        • ??? - upgrade infrastructura cave (Optic fibers)  (DE, CS & PK, FR)
        • FW dezvoltare finala (Claudiu)
          • FPGA clk generare (generare TDC)
          • programarea ADC-ului
          • sincronizarea ADC + citire
      • -> 15.03 - implantare componente pentru toate cartelele
      • -> 15.04 - CBM (probabil)

      Mecanica

      • suporti cartele cu inaltime variabile (RAndrei)
      • tresa de masa

      LV [done]

      • de testat dependenta puterii de counting rate (pulser)

      HV

      • 3 canale HV ISEG (Philipp) [done]
      • 3 cabluri HV 5m (SHV) (done)
      • 3 cabluri HV 10m 10m (SHV)(done)
      • de verificat filtrele de HV

      DAQ

      • CROB - inca 3 buc (Joerg / Claudiu)
      • optical fibers pentru 6 CROB/module + mapping (David / Claudiu) (done)
        • CROB13 fara conexiune la prima testare - De schimbat CROB [in progress]
    • 4
      Production readiness prototype status
      Speaker: Laura Radulescu (IFIN-HH)
      • Placa de montaj pentru construirea detectorului (RAndrei / Laura) (20.02)
      • lista de preturi actualizata pentru constructia unui module TRD2D -> Addendum (Laura)
        • oferta 1 : ProPlastic Bucuresti [done]
          • receptie 29.02.24 [Laura] [done]
      • Fire Anodice
        • aliniere anod vs catod (Andrei N/Alex) https://indico.nipne.ro/event/287/  - 15.03 [in progress]
        • RAMA DE BOBINAT (R Andrei / Andrei H / Andrei N / Laura /) - 15.03 [in progress]
        • calibrare masurat pitch/tensiune (Andrei H) [done]
      • HV box : 
        • PCB (Cara/Bugi/Claudiu) achizitie de piese [running]
        • PCB design [done]
          • s-a identificat o posibila strapungere electrica la condensatori - solutie cu Silicon, Araldit, etc
        • Proiect mecanic (Andrei R.) [in progress]
        • Surse ISEG : CBM OK, pret ???, incercam o integrare LV + HV + pulser (Claudiu, Alex, Laura, Cara)
        • Testare cablu SHV la radiatie IRASM {Laura / Cara} 29.02 -> nu s-a intrunit qurumul !
      • Cartela FEB (mass production) - testare [in progress]
      • Cartela DCS (senzoti temperatura, ADC, interfata DCS, interfata TFC, programare JTAG, pulser) 
        • (may use lpGBTx / GBTx) 
      • simulari pentru noua geometrie (mecanica + FEE) 
        • material budget pentru varianta aleasa (Alex) [in progress]  
    • 5
      FASP bonding [on hold]
      • final conclusions
      • strategy
        TBD dupa finalizarea testelor la mCBM24
      Speakers: Claudiu Schiaua (IFIN-HH/DFH), Alexandru Bercuci (IFIN-HH)

      de discutat dupa campania de la mCBM