Please upload your talks before meeting starts

TRD-2D weekly

Europe/Bucharest
Conference room Building A (DFH)

Conference room Building A

DFH

Alexandru Bercuci (IFIN-HH)
Description

  Weekly reports on local activities done for the TRD-2D project of the CBM collaboration.

Meeting Access Information

    • 09:00 09:05
      Intro 5m
      Speakers: Alexandru Bercuci (IFIN-HH), Andrei Herghelegiu (National Institute of Physics and Nuclear Engineering (IFIN-HH)), Claudiu Schiaua (IFIN-HH/DFH), Gheorghe Caragheorgheopol (National Institute of Physics and Nuclear Engineering (IFIN-HH)), Laura Radulescu (IFIN-HH), Mariana Petris (National Institute for R&D in Physics and Nuclear Engineering (IFIN-HH), Bucharest), Prof. Mihai Petrovici (National Institute for Physics and Nuclear Engineering (IFIN-HH)), Vasile Catanescu (National Institute of Physics and Nuclear Engineering (IFIN-HH))
    • 09:05 09:35
      Production readiness prototype status 30m
      Speaker: Laura Radulescu (IFIN-HH)
      • finalizare plata/factura si ultimul cadru
      • constructia  prototipurilor
        • finalizare HC pt backplane (Florin / George / Vali) [1.04 -
        • cutiutele de gaz [27.03
      • Fire Anodice
        • aliniere anod vs catod (Andrei N/Alex) https://indico.nipne.ro/event/287/  - 22.03 [in progress]
          • CNC QA (Garbel)
          • masa cinematica (micrometrica) [done]
          • se montaza succesiv elementele mesei (29.03) !
        • RAMA DE BOBINAT (R Andrei) - 26.03 [de finalizat]
          • vinclu 3 x 30 x 30 x 2000 (Andrei N) - se cumpara
          • bobinare/testare cu fire Cu-Be 1.5 (Andrei H) fara separarea jumatatilor [26.03 
        • test final RAMA + ALINIAMENT 29.03
      • HV box : 
        • PCB (Cara/Bugi/Claudiu) achizitie de piese [running]
        • PCB design [done]
          • de identificat o lista de componente comercial disponibile.
        • Surse ISEG : CBM OK, pret ???, incercam o integrare LV + HV + pulser (Claudiu, Alex, Laura, Cara)
        • conector HV asemanator CBM ToF
      • Cartela FEB (mass production) - testare [in progress]
        • 22.03 FW via CROB
        • 20 FEB in casa [15.12.23 ->  
        • De identificat 2 - 3 CROB (Joerg)
      • simulari pentru noua geometrie (mecanica + FEE) 
        • material budget pentru varianta aleasa (Alex) [in progress]  
    • 09:35 09:55
      mCBM preparation and first data analysis 20m

      -status of FEB production / test

      Speakers: Claudiu Schiaua (IFIN-HH/DFH), Alexandru Bercuci (IFIN-HH)

      Date mCBM 2024

      • Vineri - Sambata [22-23.03]

      Tactica

      • -> 19.02 - primele 3 cartelele de test ajung in DFH
        • FW dezvoltare finala (Claudiu)
          • o problema la canalul 0 al FASP (ne sistematic)
          • testare cu pulser - fisier tsa
      • -> 15.03 - implantare componente pentru toate cartelele
      • -> 15.04 - CBM (probabil)

      Mecanica

      • suporti cartele cu inaltime variabile (RAndrei)
      • tresa de masa

      LV [done]

      • de testat dependenta puterii de counting rate (pulser)

      HV

      • 3 canale HV ISEG (Philipp) [done]
      • 3 cabluri HV 5m (SHV) (done)
      • 3 cabluri HV 10m 10m (SHV)(done)
      • de verificat filtrele de HV

      DAQ

      • CROB - inca 3 buc (Joerg / Claudiu)
      • optical fibers pentru 6 CROB/module + mapping (David / Claudiu) (done)
        • CROB13 fara conexiune la prima testare - De schimbat CROB [in progress]
    • 09:55 10:15
      FASP bonding [on hold] 20m
      • final conclusions
      • strategy
        TBD dupa finalizarea testelor la mCBM24
      Speakers: Claudiu Schiaua (IFIN-HH/DFH), Alexandru Bercuci (IFIN-HH)

      de discutat dupa campania de la mCBM