Description

  Weekly reports on local activities done for the TRD-2D project of the CBM collaboration.

Meeting Access Information

    • 09:00 09:05
      Intro 5m
      Speakers: Alexandru Bercuci (IFIN-HH), Andrei Herghelegiu (National Institute of Physics and Nuclear Engineering (IFIN-HH)), Claudiu Schiaua (IFIN-HH/DFH), Gheorghe Caragheorgheopol (National Institute of Physics and Nuclear Engineering (IFIN-HH)), Laura Radulescu (IFIN-HH), Mariana Petris (National Institute for R&D in Physics and Nuclear Engineering (IFIN-HH), Bucharest), Prof. Mihai Petrovici (National Institute for Physics and Nuclear Engineering (IFIN-HH)), Vasile Catanescu (National Institute of Physics and Nuclear Engineering (IFIN-HH))
    • 09:05 09:25
      Milestones 20m
      Speakers: Alexandru Bercuci (IFIN-HH), Prof. Mihai Petrovici (National Institute for Physics and Nuclear Engineering (IFIN-HH))
    • 09:25 09:55
      Prototype production status (postponed) 30m
      Speakers: Laura Radulescu (IFIN-HH), Mr Andrei Radu (IFIN-HH), Mr Andrei Naziru (ELI-NP), Andrei Herghelegiu (National Institute of Physics and Nuclear Engineering (IFIN-HH))
      • constructia  prototipurilor
        • finalizare HC pt backplane (Florin / George / Vali) [1.04 -
        • degajari pt flat-uri la ProPlastic (Laura), Se foloseste BP testat cu laser pentru productie
        • cutiutele de gaz - de finisat [27.03
      • Asamblare
        • ferestrele de intrare (R Andrei) [9.04 -
      • Fire Anodice
        • bobinare pt catod (5h) - de testat uniformitatea de bobinare si deformarea ramei (Andrei H)
          • cu fire Cu-Be 1.5 (Andrei H) fara separarea jumatatilor [26.03 
          •  
        • aliniere anod vs catod (Andrei N/Alex) https://indico.nipne.ro/event/287/  - 22.03 [done]
          • CNC QA (Garbel)
          • finalizat componente de protectie si rama de fixare detector [15.05]
        • RAMA DE BOBINAT (R Andrei) - 26.03 [de finalizat]
        • test final RAMA + ALINIAMENT 29.03
      • HV box : 
        • PCB (Cara/Bugi/Claudiu) achizitie de piese [running]
        • PCB design [done]
          • de identificat o lista de componente comercial disponibile.
        • Surse ISEG : CBM OK, pret ???, incercam o integrare LV + HV + pulser (Claudiu, Alex, Laura, Cara)
        • conector HV asemanator CBM ToF - testare la IRASM (Laura Cara) [9.04 -
      • Cartela FEB (mass production) - testare [in progress]
        • 22.03 FW via CROB
        • 20 FEB in casa [15.12.23 ->  
        • De identificat 2 - 3 CROB (Joerg)
      • simulari pentru noua geometrie (mecanica + FEE) 
        • material budget pentru varianta aleasa (Alex) [in progress]  
    • 09:55 10:15
      mCBM integration (postponed) 20m
      • data taking Ni-Ni 7-13 May
      • data taking Au-Au June
      Speakers: Claudiu Schiaua (IFIN-HH/DFH), Alexandru Bercuci (IFIN-HH)

      Date mCBM 2024

      • Vineri - Sambata [22-23.03]
      • Analiza in curs (Alex)

      Tactica

      • -> 19.02 - primele 3 cartelele de test ajung in DFH
        • FW FASPRO (Claudiu)
          • o problema la canalul 0 al FASP (ne sistematic) - baseline 
          • testare cu pulser - fisier tsa (Claudiu, Alex)
        • FW CRI pentru QSFP+ (Microsemi - Xilinx) (Claudiu)
      • -> 15.03 - implantare componente pentru toate cartelele (5.04)
        • testare 17 cartele (baseline, Start/Stop) -> raspuns David 
        • testare rezistente de intrare in canalul 0 
      • -> 22.04 - mCBM (cu siguranta)

      Mecanica [done]

      LV [done]

      HV [done]

      DAQ

      • VTTx - inca 3 buc (Joerg / Claudiu)
      • optical fibers pentru 6 CROB/module + mapping (David / Claudiu) (done)
        • CROB13 fara conexiune la prima testare - De schimbat CROB [in progress]
    • 10:15 10:35
      FASP bonding [on hold] 20m
      • final conclusions
      • strategy
        TBD* after mCBM24 data taking campaign
      Speaker: Claudiu Schiaua (IFIN-HH/DFH)

      de discutat dupa campania de la mCBM