RPC weekly meeting

Europe/Bucharest
Conference Room

Conference Room

Mariana Petris (National Institute for R&D in Physics and Nuclear Engineering (IFIN-HH), Bucharest)
    • 13:10 13:20
      Status of the twisted pair signal cable for implementation in M0 10m
      • Manual of cable manufacturing, labeling and their mapping
      • Status of the manufacturing of the signal cables
      Speakers: Florin Gila, George Stoian, Gheorghe Caragheorgheopol, Valerica Aprodu
    • 13:20 13:40
      M0 backplane equipment 20m
      • gas pipe connection
      • HV polarity labeling
      Speakers: Andrei Radu, George Stoian, Gheorghe Caragheorgheopol, Valerica Aprodu, Viorel Duta
      • realizat distantori pentru manevrarea back panel
      • montat conectorii HV
      • se vor realiza olivele si stuturile si se vor monta in conectorii de gaz
      • se va incepe efectiv activitatea la 17 septembrie pentru pipe-urile de gaz 
    • 13:40 14:10
      discussion about the components for the assembling of M0's chambers 30m
      • on-going
        - resistors soldering on HV boards
        - honeycomb plates preparations
        - subcomponents assembling
        - backplane with a connector plate for counter testing
        - HV connection of MSMGRPC

      • needed:
        - Gas distributors for 60 – 56 pieces
        - Gas distributors for 100 – 24 pieces
        - Gas distributors for 200 – 48 pieces
        - Mini-rod for 60 – 136 pieces
        - Mini-rod for 100 – 48 pieces
        - Mini-rod for 200 – 96 pieces
        - Tightening ledges - 72 pieces

      Speakers: Andrei Radu, Florin Gila, George Stoian, Valerica Aprodu

      dispozitive de manevrare modul M0 - Viorel -> de dat in lucru

      placa de test -> de dat in lucru

      limitatorii de fixat in pozitie -> de dat in lucru

    • 14:10 14:30
      Design of the CBM-TOF inner zone based on the direct flow MSMGRPCs 20m
      • priority -> design of the second M0 module. -> done!
        - back panel
        - mechanical supports
        - drawings for the housing box for a new order - done
        - status of the component procurement
      • Number of detectors by type in the CBM-TOF inner zone:
        • MRPC1a ( 60 mm) - 40
        • MRPC1b (100 mm) - 108
        • MRPC1c (200 mm) - 168

      -status of the design of the modules of the inner zone - Viorel

      Speakers: Andrei Radu, Gheorghe Caragheorgheopol, Laura Radulescu (IFIN-HH), Viorel Duta
    • 14:30 14:50
      INVENTOR compatibility check and procurement 20m
      • transfer of knowledge status
      • status of the procurement - Andrei Naziru
      Speakers: Andrei Naziru, Laura Radulescu (IFIN-HH), Viorel Duta
    • 14:50 15:10
      backup of all files belonging to the design of the CBM-TOF inner zone 20m
      • design of the spacers' position - Laura
      • any update made from last backup - Laura
      Speaker: Mariana Petris (National Institute for R&D in Physics and Nuclear Engineering (IFIN-HH), Bucharest)
    • 15:10 15:30
      Assembling manual 20m
      • chamber assembling -> in progress
      • what about module assembling manual? Viorel, Cara, Laura, George, Vali
      Speakers: Mariana Petris (National Institute for R&D in Physics and Nuclear Engineering (IFIN-HH), Bucharest), Valerica Aprodu
    • 15:30 15:40
      Status of the in-kind contract draft 10m
      Speakers: Mariana Petris (National Institute for R&D in Physics and Nuclear Engineering (IFIN-HH), Bucharest), Prof. Mihai Petrovici (National Institute for Physics and Nuclear Engineering (IFIN-HH))
    • 15:40 16:00
      aob 20m