  Weekly reports on local activities done for the TRD-2D project of the CBM collaboration.

Meeting Access Information

Addendum - end Jan

In-kind contract

  • first structure : end Feb
  • first draft : end Aug

FEB/FEE development

  • FEB test - end Mar design done. 
  • FASP prod - end Mar
  • FASP bonding/test - CERN. end Apr (FASP-PCB check Claudiu)
  • FASP packing - end May
  • FEB test - end May done and usable
  • ADC 8ch 14$/pc. end Apr ordered
  • FEB (FASP-FEB, CLK-FEB, OPTIC -FEB) : design end Aug
  • FEB (FASP-FEB, CLK-FEB, OPTIC -FEB) : ready end Oct.
  • TRY to equip 2 TRD2D (2012 + 2022) to be installed at mCBM

TRD2D prototype testing

  • Assembly and Testing manual end Feb
  • X rays + Fe end Mar/Apr
    • uniformity scan (current measurement - see OROC)
    • long term stability and check dark current
    • high counting rate ?! to be decided HOW

mCBM data analysis

  • TRD2D in Lambda reconstruction end May

TRD proposal for CBM

  • Discuss next week a realistic proposal for the list of items and schedule of the TRD2D

FASP-ADC single channel

  • submission end Oct

 

There are minutes attached to this event. Show them.
    • 09:00 10:00
      TRD2D planning 2023 1h
      • Addendum defense
      • Testing prototype
      • mCBM data analysis, promoting TRD2D for CBM
      • FEE / FEB preparation
      • CBM integration / planning activities
      • CBM in-kind contract