  Weekly reports on local activities done for the TRD-2D project of the CBM collaboration.

Meeting Access Information

    • 1
      TRD2D PRR Construction
      • open questions and decision request
      Speaker: Laura Radulescu (IFIN-HH)
      • Pentru fiecare layer exista 4 HUB-uri de HV cu 2x(2x6) si 2x(3x6)
      • PP urmarita testarea lipiri flat cable. Tentativ incercam varianta ieftina fara gauri umplute. 
      • D+K - teste radiatie, cabluri lemo (Laura 1w)
      • Ax4 - 140470. 

       

    • 2
      TRD2D PRR Tests (from last time)
      • Final tests (A. Herghelegiu)
      Speaker: Alexandru Bercuci (IFIN-HH)
    • 3
      mCBM 2024
      • FEE CROB
      • new FEE
      • beamtime schedule
      Speakers: Claudiu Schiaua (IFIN-HH/DFH), Alexandru Bercuci (IFIN-HH)

      Hi All, 

      it was found the CROBs should not be operated at 12 V supply voltage, but with 7.5 V. 

      Reason is not only to enable SCA usage, but also to avoid a risk of damage. Was found and investigated by Walter, see 
      https://git.cbm.gsi.de/walters-test-environment/dca-prototype/-/issues/40#note_29505 

      Also in contact with SCA designers, he assumes a risk of high ageing/damaging of the ADCs in the SCA with 12 V at the CROB input. 

      @Alex, Claudiu: As far as I remember, the TRD-2D uses the LV supply channels mixed for CROBs and other FEE, right? Nevertheless, maybe lowered voltages can be realised. Please let me know when any MPOD channels can/shall be changed in this regard. 

      @All: TRD-1D CROBs in mCBM are changed to 7.5 V already. Please consider the new voltage recommandation also in your lab setups. 

      Best 
      Philipp