  Weekly reports on local activities done for the TRD-2D project of the CBM collaboration.

Meeting Access Information

    • 09:00 09:05
      Intro 5m
      Speakers: Alexandru Bercuci (IFIN-HH), Andrei Herghelegiu (National Institute of Physics and Nuclear Engineering (IFIN-HH)), Claudiu Schiaua (IFIN-HH/DFH), Gheorghe Caragheorgheopol (National Institute of Physics and Nuclear Engineering (IFIN-HH)), Laura Radulescu (IFIN-HH), Mariana Petris (National Institute for R&D in Physics and Nuclear Engineering (IFIN-HH), Bucharest), Prof. Mihai Petrovici (National Institute for Physics and Nuclear Engineering (IFIN-HH)), Vasile Catanescu (National Institute of Physics and Nuclear Engineering (IFIN-HH))

      From the official summary of the Council by the FAIR Management:

       

      • “Good news on additional shareholder contributions: Poland (formal letter from Poland will follow until end July 2024), France, Sweden
      • Good news regarding the commissioning budget: the proposed commissioning budgets were supported by the CSG and commissioning budgets have been released by the Council for the years 2024 and 2025 as a new budgetline with additional budget.
      • Good solution process regarding power cables from India: critical Inkind supply by India urgently needed in line with the site installation process.
      • Good news regarding time critical components for CBM beamline - magnets and vacuum components: the Council is supporting the procurement of these time critical items as long as the overall budget situation is positive. With the formal confirmation of the contribution from Poland end of July 2024 a decision in writing will be initiated to approve this procurement step. The tendering process for these components can start already immediately.
      • The next Council meeting in December 2024 will take place in Kolkata, India with the hope that in the phase towards this meeting in December 2024 the Indian shareholder can make steps forward in granting an additional contribution for FAIR.”

      This means we have a beamline to the CBM cave approved!

       

      Tetyana Galatyuk

               on behalf of the CBM Management Board


       


       

    • 09:05 09:35
      Prototype production status 30m
      Speakers: Laura Radulescu (IFIN-HH), Mr Andrei Radu (IFIN-HH), Mr Andrei Naziru (ELI-NP), Andrei Herghelegiu (National Institute of Physics and Nuclear Engineering (IFIN-HH))
      • constructia  prototipurilor
        • montarea back-plane (R. Andrei) [1.07 - 
        • winding + asamblare (team) [15.07 - 
        • testare (team) [25.08 - 

      ==============================================================================

      • Asamblare
        • 2 x ferestrele de intrare (R Andrei) [9.04 - 21.05]
        • pad-plane [1.07 -
      • Fire Anodice 
        • aliniere anod vs catod (Andrei N/Alex) https://indico.nipne.ro/event/287/  - 22.03 [done]
          • NUC - functional !!!
          • conexiuni - finalizate, trese - de asamblat (26.06 - )
          • masa rotatie - (28.06 -
        • test final RAMA + ALINIAMENT [29.03 -
      • HV box : 
        • PCB (Cara/Bugi/Claudiu) achizitie de piese [running]
        • PCB design [done]
          • de identificat o lista de componente comercial disponibile.
        • Surse ISEG : CBM OK, pret ???, incercam o integrare LV + HV + pulser (Claudiu, Alex, Laura, Cara)
    • 09:35 09:55
      mCBM results 20m
      • data analysis
      • calibration
      Speakers: Alexandru Bercuci (IFIN-HH), Claudiu Schiaua (IFIN-HH/DFH)

      Beam-time campaign

      1. warm-up phase                                                  Tue 18.06  09:00  - Tue 18.06  18:00
      2. low-rate, detector performance tests              Tue 18.06  18:00  - Wed 19.06 9:00   
      3. rate-scan, detector performance tests           Wed 19.06  9:00  - Wed 19.06 16:00  
      4. high rate, detector performance tests              Wed 19.06  16:00  - Fri 21.06    6:00  (also high rates measurements 25 kHz/cm2 in ToF) 

      Test and Calibration activities

      1. Pulser runs - testare FW
      2. 55Fe si 90Sr
      3. CR

      Data taking with fast-extracted U beam T=0.9AGeV (charge state 73+, 17.15 Tm rigidity), June 20, 2024 (C Sturm from MM):

      • 3.3s cycle time (sync to UNILAC, acceleration, cooling, extraction)
      • approx. 1us extraction duration
      • first run #3192, common start: 14:50 CEST, common stop 15:01 CEST, duration 00:11h (short run for fast offline data analysis)
      • last run #3199, common start: 20:53 CEST, common stop 22:00 CEST, duration 01:07 h
      • all runs taken with 2.5mm Au target
      • all runs taken with tag: 2024/production/june_write_pub_all_dets_much6_hdd
      • constant and stable beam conditions
      • beam intensity ? Might be 100 U ions per 1us extraction within a 3.3s cycle. But this is not measured since particle counters of the present beam diagnostics cannot cope with fast-extracted beams.

       

    • 09:55 10:15
      In-kind contract [costs] 20m
      • Chamber
      • FEE
      • Infrastructure
      Speaker: Alexandru Bercuci (IFIN-HH)

      FEB [Jochen] :

      lpGBT: 37 CHF per part
      VTRX+: 210 CHF per part
      picoTDC: 315 CHF per part
      GaN controller: 23 CHF per part
      
    • 10:15 10:35
      FASP bonding [on hold] 20m
      • final conclusions
      • strategy
        TBD* after mCBM24 data taking campaign
      Speaker: Claudiu Schiaua (IFIN-HH/DFH)