TRD-2D weekly
Meeting room building B
DFH
Local report on activities done within the TRD-2D project for CBM
mCBM campaign preparation
- preparation of the 2022 mCBM campaign: NEED 25 pcs FASPRO+GET
- FASPRO DR1 boards. May have unknown problems (9 pcs) - to be tested on a later stage
- FASPRO DR2 boards with short-cuts (15 pcs) - install FASP and then test with local acquisition
- Problems with FASP-FASPRO mounting
- GETS boards (25 pcs)
- To discuss with Mdm Costovici (Cara/Bugi) to fix the FASPRO boards. After software testing.
- Buy a new batch of chip components for the full TRD-2D (Cara - info)
status of ongoing activities
FEE for mCBM (Claudiu)
No progress on the FEE integration. CADENCE installation to be continued.
FLIM modification initiative.
Tools for building the TRD-2D prototype for EDR (Cristi)
- winding wires on big frames. steering program started and working. Tests with actual wires are ongoing in the following days.
- wire tension tool not yet tested (Cristi next week).
- to be checked consumables (technicol and blue tape) for wire winding procedure (Laura -> A Radu, Vali)
Material acquisition for the TRD-2D prototype (Laura)
- if possible the entrance window (C plate + HC) should be ordered with no mechanical details (e,g, for lateral ledges)
- if possible should be ordered already plated with Al foil !
a.o.b
- George started learning curve towards data analysis
- Daniel should be discussed a plan for a Master thesis on the CBM/mCBM topic (TRD-2D)