Please upload your talks before meeting starts

TRD-2D weekly

Europe/Bucharest
Meeting room building B (DFH)

Meeting room building B

DFH

Alexandru Bercuci (IFIN-HH)
Description

Local report on activities done within the TRD-2D project for CBM

mCBM campaign preparation

- preparation of the 2022 mCBM campaign: NEED 25 pcs FASPRO+GET

  • FASPRO DR1 boards. May have unknown problems (9 pcs) - to be tested on a later stage
  • FASPRO DR2 boards with short-cuts (15 pcs) - install FASP and then test with local acquisition
  • Problems with FASP-FASPRO mounting
  • GETS boards (25 pcs)
  • To discuss with Mdm Costovici (Cara/Bugi) to fix the FASPRO boards. After software testing.
  • Buy a new batch of chip components for the full TRD-2D (Cara - info)

status of ongoing activities

FEE for mCBM (Claudiu)

No progress on the FEE integration. CADENCE installation to be continued.

FLIM modification initiative.

Tools for building the TRD-2D prototype for EDR (Cristi)

- winding wires on big frames. steering program started and working. Tests with actual wires are ongoing in the following days.

- wire tension tool not yet tested (Cristi next week).

- to be checked consumables (technicol and blue tape) for wire winding procedure (Laura -> A Radu, Vali)

Material acquisition for the TRD-2D prototype (Laura)

- if possible the entrance window  (C plate + HC) should be ordered with no mechanical details (e,g, for lateral ledges)

- if possible should be ordered already plated with Al foil !

a.o.b

- George started learning curve towards data analysis

- Daniel should be discussed a plan for a Master thesis on the CBM/mCBM topic (TRD-2D)

There are minutes attached to this event. Show them.