TRD-2D weekly
Local report on activities done within the TRD-2D project for CBM
Status of FEE development for mCBM
- test to the second GBTx at GSI started
- test communication with SCA (slow control), testing various configurations. WIP
Status of software development for mCBM
- data readout DONE
- simulation readiness DONE
- FW FLIM design meeting 13.10. The FLIM interface will be modified for 2022 mCBM data taking.
- First try of a cathode wire plane of ALICE type. Software might need recalibration
- Transmission problems which has to be addressed (RA)
- measuring device for distance and wire tension (Cristi) 1wk
- wires A & K for the new prototype (Mariana, Laura Cristi) 1wk
- spacer calibration device (pieptene) for 1.5mm has to be produced. A first version of it can be discussed with RA and tested if it is enough for current needs. (Laura) 1 week
- Joerg will provide the 3mm device (Mariana, Joerg) 1 week
- The design can be implemented on a PCB. Precision of 0.1 mm. (Claudiu)
Entrance window construction
- next deadline 2wk (MP and RA)
- the entrance window ledges for the Kapton prototype can be done by Gigi. Vali and Lucica can assemble the window. (Laura) 1wk
TRD-2D Addendum
- PS participation date should be discussed during the TRD weekly meeting
- Draft for CBM rehearsal (21.10.2021 Alex)
Youngsters involvement in the group
- Next Monday finish tutorial introduction.
AOB